Jump to content

Log in or register to remove this advert

Spraying work charges per metre


evergreen
 Share

Recommended Posts

Hi Guys

 

Ive been asked by a local council to give a rate per metre for knapsac spraying glyphosate on footpaths and kerbing along roadsides. Ive never been asked this before normally just priced up fixed areas. I can see the logic behind it because the council can work out how much they can budget for in the season.

 

A rough calculation I made was based on £22.50/hr. Which is 37.5p/second. I thought path and kerbside would take 4 seconds per metre. So £1.50 per metre.

 

Am I way off the mark here?

 

I would be happy to know what others are charging for this sort of service.

 

Cheers

 

Nick

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 20
  • Created
  • Last Reply

Top Posters In This Topic

Im revising my original costing maybe to 2 seconds per metre. So 75p/metre.

 

All comments gratefully appreciated.

 

Nick

 

You need a new calculator

6pence a second more like

how far can you walk with a knapsack in 1 minute-

3miles /hr

4500metres/hr

4500metres/3600seconds

round it up = 2seconds per metre

knapsack rate has to include stops to fill every say 5-10mins depending on volume

include this in your calc.

Round here the contractors use quad bikes with a big tank on- they motor at about 5-8mph. This must be the most competitive way to do it.

Add in costs of chemicals- once again depends on those being used and rate

This time of year I guess it's just Glyphosate.

Good luck

Link to comment
Share on other sites

Hi likeitorlumpit.

 

i dont need a new calculator just a new brain! I wont even tell you what i got wrong its far too embarrasing!

 

Thanks for the advice. I will work it out properly now and post it up for scrutiny!

 

Cheers

 

Nick

Link to comment
Share on other sites

Hi likeitorlumpit.

 

i dont need a new calculator just a new brain! I wont even tell you what i got wrong its far too embarrasing!

 

Thanks for the advice. I will work it out properly now and post it up for scrutiny!

 

Cheers

 

Nick

 

Bear in mind its probably spot treatment so you won't be spraying every metre so you need to ask whether they are paying every metre.

I suspect they will be and the price/rate will reflect this

Link to comment
Share on other sites

Hi likeitorlumpit.

 

i dont need a new calculator just a new brain! I wont even tell you what i got wrong its far too embarrasing!

 

 

Nick

 

I do it with time, its not been made metric yet!!!!!:001_huh:

Link to comment
Share on other sites

Thanks guys, I always feel a lemon on these pricing things, but here goes.

 

Ive worked it out for 100m pathway and kerbing (which they asked for). Based on hourly labour rate £22.50 and 5 min refill time per 100m

 

labour including refilling £3.20

Glyphosate 80p

 

Total £4.00 + vat per 100m single side of carraigeway

 

Am I in the ballpark?

Link to comment
Share on other sites

Hi Guys

 

Ive been asked by a local council to give a rate per metre for knapsac spraying glyphosate on footpaths and kerbing along roadsides. Ive never been asked this before normally just priced up fixed areas. I can see the logic behind it because the council can work out how much they can budget for in the season.

 

A rough calculation I made was based on £22.50/hr. Which is 37.5p/second. I thought path and kerbside would take 4 seconds per metre. So £1.50 per metre.

 

Am I way off the mark here?

 

I would be happy to know what others are charging for this sort of service.

 

Cheers

 

Nick

 

If it's any help the rate in Spons (2011) is £83.76 per 1Kilometer - about 5.5p a metre for power spraying by quad etc. Not a bad rate as we could spray 20 kilometers no problem in a 1/2 day.

Link to comment
Share on other sites

If it's any help the rate in Spons (2011) is £83.76 per 1Kilometer - about 5.5p a metre for power spraying by quad etc. Not a bad rate as we could spray 20 kilometers no problem in a 1/2 day.

 

Hi Gareth

Thanks for that, is that Spons external works and landscape price book?

Also I assume thats a single side rate(If theres such a thing as that)?

I have worked out with a knapsac we can do it for 4p/metre. Its all just small scale village stuff. No streets more than a couple of hundred metres.

Please bear with me on this and I hope no offence is taken at my stupidity, but I just want to get it clear in my head.

Cheers

Nick

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.