Jump to content

Log in or register to remove this advert

brainwave


garry kidd
 Share

Recommended Posts

at the moment im currently working as a door supervisor on bars and pubs until work pics up for me and basically i had a brain wave for a skiline basically a double drum winch powered my tractor or unimog 1 line for lowering and raising the carrage and the other for pulling in the wood a basic roller and hook as a carriage with chain chokers to wrap around the timber and some form of steel frame work to lift the cables higher enough to clear the stumps and what not

 

 

was this a bit of a mad moment in the freezing cold last night or is this used by any 1 or ever been atempted

Link to comment
Share on other sites

Log in or register to remove this advert

its a good way of winching stuff out but very slow if you were talking about shylining for clearfell. But for a trick up your sleave on the right job its simple enough but the problem you would have is the lines are at the same height at the landing zone, you would need your top wire hire for it to work effectively, thats why the old ones were like a tripod on wheels. And you wont be able to send the wire back down you would have to drag it down or join the 2 together and have the top one high, so you could send it back and forward, but this is all in my head and i reckon it would be a nightmare to do and set up correctly to work efficiently. If you are after setting yourself up as a skidder or winching service then i think you could find a niche market with the right bit of kit, i would buy the little skidder in classifieds, the mog one of woodmads, it is the ultimate quick, on road off road skidder for small scale work but still has the grunt for big hardwoods..

Edited by Stephen Blair
Link to comment
Share on other sites

Seen it done with a three point linkage double drum and then a pulley block mounted on a 360 or a Drott/Dozer and that way you can move it quickly across the bank too as both ends of the system are mobile - worked well and dead cheap as using machines that were already on site. :thumbup1:

 

Forgot to say - did have to take the cables off the drums and run one long one as otherwise it didn't go through the pulley.

Edited by Chris Sheppard
missed a bit
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.