Ive done the odd call out the latest Ive finished is 3.30am both times I charged far to less.

 

Just wondering these things, how do you price for the work, whole job of just time spent per hour say? What sort of contract do you make with the client verbal / written before you start and singed?

 

When pricing for this do you include not being able to not work the next day if you are all bo$£oxed?

 

How do you stand on H+S with the working hours where you could have worked all day then the whole crew called out in the evening and work most of the night.

Log in or register to remove this advert

Posted
Ive done the odd call out the latest Ive finished is 3.30am both times I charged far to less.

 

Just wondering these things, how do you price for the work, whole job of just time spent per hour say? What sort of contract do you make with the client verbal / written before you start and singed?

 

When pricing for this do you include not being able to not work the next day if you are all bo?

 

How do you stand on H+S with the working hours where you could have worked all day then the whole crew called out in the evening and work most of the night.

ifor the last part emergency work excludes you from driving hours and working hour probs but emergency work is always a grey area as the road could be closed or building evacuated but have worked all night too many times the worst was 102 hrs with 8 off and ended up poorly and doubt i would do it again

Posted

Last emergency job I did, £2200 for 3 hours. that was 1 huge oak fallen into 1 huge beech over a main road. Whole lot cleared off site.

IMO, most emergency work is not worth the bother unless you charge 'proper' money.

Posted
How the hell did you get that done in 3 hours??

 

I was thinking the same , mind you Ed does have a 6 wheeler and hi-ab, if I need more kit on sight such as tractor and grapple the price would shoot up as well

Posted

easy peasy - and it was just 2 of us. we cut the whole lot down into the road, cut it all and dressed it out.(road closure in place) reversed the 8 wheeler up to the huge pile and threw it all back into the wood. My timber crane is rear mouted, so makes it great for that type of work. The 8 wheeler was getting a little bulky and long in the tooth, so I've just replaced it with a 6 wheeler. In my opinion, its more usefull than any other piece of kit, even the chipper.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.