  1. Ah, I see, apologies. The machine is incredibly manoeuvrable, and it's only 1.45m wide, so can slip between trees in the next rack as required and can easily turn within a rack. You'd process however many trees are required to fill the forwarder to one point, then move on. That way, the forwarder only has to stop once for each load.
  2. The machine works in conjunction with my mini forwarder (Logbullet, weighs 2t, carries a little less) so I don't need to turn the tree. I can pick up the logs from where ever they land. 90 degrees to the rack is fine.
  3. You just level the rack from one end to the other, starting with the last one you felled. When pulling trees from the matrix, you don't need to get them on the deck as the winch pulls them out to the head. The stroke processing head can handle some fairly large branches too.
  4. With the machine in the video? That's not me, just a Youtube video. On first thinnings, you'll do a tree every 3-4 minutes (processing time per tree once the stem is in the head is less than 45 seconds), with a cutter knocking them over ahead of you. Assuming 0.2 tonnes per tree, you'll do 3-4 tonnes an hour. The great thing is (and this theory, as I've not yet found large enough sites to test it) that your cutter and machine operator can swop over every couple of hours. Much less tiring than hand processing, no stacking and on rack thinning with selective removal from the matrix, it should be able to do a lorry load a day.
  5. £23k. Handles trees up to about 35cm, but in order to winch something that size into the head, you need a bit of a gravity assist. It won't winch it up a hill. I bought it with a lot of contracting work in southern Scotland in mind, but found loads of work down here that was mostly hardwood, so it's only done about 20hrs so far. Have a whole load of pine I could do with it later in autumn though
  6. I have one of these already: It's a bit faster than the demo video would suggest and it's great for chipwood. Don't get to use it as much as I'd like.
  7. The site is too small for it to be economical for larger machines to be transported to site. 300 cube, or thereabouts.
  8. The big companies aren't offering enough for harvesting, IMO. I was asked to look at a DF thinning job on a banking where they were offering £28/t to cut and extract on 0.6m cube trees. It's not enough, and I wouldn't make enough once the cutters have been paid.
  9. I do agree that cutters are on the whole completely undervalued. The chap staying in the caravan on site is in the caravan because there is no accommodation nearby and he doesn't drive. What other option would he have? I started out on self-select hardwood thinning and if I do say so myself, I am very good at it. Softwood felling isn't my forte but put me on 70ft 12" dbh beech, ash, oak or sycamore, and very few people will outcut me. My point is that I'm not a machine operator that doesn't have cutting experience. Can we just agree that cutter rates need to go up across the board and that whilst my rates are good, they could go up too? You've rather derailed my thread, which I'm not entirely happy about.
  10. It's a shame really as a basis in forestry would mean that they are far better equipped when working in Arb. But many just don't want to do it. I had a young lad on a site a while back, came with another cutter. This young lad was a tree surgeon but really, really struggled in the woods. Production rate was about 10-15% of what my usual cutters were doing, and he was hanging tree ups constantly. After a day, I was getting to the end of my tether, and as I drove past him starting on a tree (15" DBH, if I was to guess) taking off the first buttress when it didn't need to be debuttressed. I drove down to the loading bay and then passed him on the way back up 7-8 min later. Taking off the third buttress. He then misjudged the fell, the tree sat back on his saw and it had to be winched over. After that, I put him with my best cutter for the afternoon and his production rate tripled. I said that I couldn't have him back under the current arrangement, but I'd be prepared to pay him £100/day to work alongside my best cutter for a week. It wasn't something that would benefit me, but it would be very valuable for him. He declined and is as far as I know back to doing small garden trees and hedges. My point is, that you can lead a horse to water, but can't make him drink. There are some excellent tree surgeons out there, but I think most of them have some forestry experience. Having that ability to cut effectively means that a lot of the cross over jobs (site clearances, estate work) can be very profitable and a lot less hassle than domestic arb.
  11. No, he's cutting extremely well and he doesn't need guidance. He has however been working with me off and on for 7 years, and we've got a very good understanding. You also have to think that if he's on site without transport and I'm collecting him from the airport, transporting him to site, buying him a caravan, fetching his gas bottles and taking him shopping for his food (as well as collecting fuel), then my costs are more than the £200/day I'm paying him. He is also working under my insurance. I agree that wages need to go up overall and that there is a shortage of cutters. The issue is that the pricing of jobs hasn't yet caught up to that fact so it's not something that can be done overnight. £35/hr might be feasible for the top 1%, but most cutters aren't worth that. Personally, I'd much rather stay in a caravan on site than have to commute back and forth or use a B and B. The main issue is that most folk when they think of chainsaw work just jump straight into tree surgery. There is much more work and indeed money in hand cutting, but very few tree surgeons can do production felling to any standard. I think we agree in principle on a lot, but it still feels like you're having a go at me when I'm paying more than most, offering working conditions that are very good on sites that are interesting and varied.
  12. That is fair enough. I am planning to increase my wages once the guys working for me have more experience working to my specs, have more tickets and are more independent of me in terms of accommodation. For instance, two chaps that came down from northern Scotland for work in January and February were each paid £200/day, but had accommodation pretty much onsite paid for them, as well as fuel money for driving down. A different chap from central Scotland who's on this site had half his flight money paid for (and collected from the airport and taken shopping enroute to site), a caravan bought for him and also £200/day pay. I don't think that £1000 a week with the only cost machine wear and petrol is shabby at all. The other issue is that tonnage rate isn't often possible as we rarely work sites as easy as this one. The last one was a 2-month job on steep banking, 500t of it was ash thinnings with minimal sawlogs and 300t of it was oak with 50% sawlogs. 75% of the total timber was winched, and the ground conditions were poor. Dayrate cutting means consistency of income for the cutters, with me assuming the risk for production rates. My profit wasn't great on the ash thinning job, not at all, but my cutters still made the same. I make more from the current site, and my cutters still make the same dayrate. The chap from Central Scotland is coming down to work 2 weeks on, 1 week off from now on (but works 6 day weeks). That means that he's clearing an average of £3600/month, which I genuinely think is a good rate.
  13. You are the first person I have come across to suggest that £200 is below market rate. I know of one cutter (not local) who is on more than that generally, but he is extremely experienced doing specialised work. For run of the mill cutting, in a variety of scenarios (production based and day rate based), £200 is well above average for this part of the country.
  14. ESS, I respect your experience in the industry but I wouldn't work for those rates. For too long forestry has made too little money and it's a skilled and risky business. The price of timber roadside is high enough for everyone to do well on it and I pride myself on doing a good job, but not being the cheapest.
  15. Thanks for the encouragement Colin, it's a wonderful place to work ?
  16. This is a slightly below average weight load as it contains no 4.9s and the 3.7s were a touch smaller than average. Also, so general scenery shots. Managed 11 loads today (around 65 tonnes) but that was extracting directly from felling, instead of from stacks created by the forwarder.
  17. I hope you appreciated the setup there ?
  18. I have to say, I wasn't expecting that.
  19. It's an estimate based on the whole site. We've one awkward corner to do with some winching, where production will be greatly reduced and cost increased. Also, one of the chaps cutting for me is down from Scotland, so I've paid some of his costs. You ask a lot of questions. Can you not just be happy that it's a lovely job to work on, I'm making good money, the landowner is happy and my cutters are happy and well compensated?
  20. We work 07:15 to 17:00 with lunch and breaks, so they are effectively working just under 9hrs. The two fast cutters (who are on day rate) are doing around 30t/day and the trainee is on production rate and isn't anywhere near that. There are perks beyond the day rate. I know that there are some that pay more, but not that I've heard of locally. I prefer to work on day rate as I can't be bothered to try to work out who has cut what and I also prefer a slightly slower, tidier work rate than one where the timber is banged over quickly to maximise return.
  21. Interesting! I had a meeting with the landowner this evening, and as well as marking plots, measuring trees and such like, we also discussed planting. Most likely to go with a fully planted approach, but on 3x3m spacing (usually plantation is 2x2m). This will allow natural regeneration to infill between the tubes to an extent, and also keep the costs down a bit. Thanks for all the input folks
  22. That is true, but the ground impact would have been higher. Using the combination of the little forwarder and tractor means that the tractor is generally sticking to the tracks and the forwarder mops up inbetween. I was one of four forestry companies that was invited to tender (all the others much bigger than myself, with harvesters in their armoury) and I was by far the cheapest. I'm very happy with what I'm earning, the cutters are on very good rates and the land owner is seeing an excellent return.
  23. It's only been two machines running side by side for about 25% of the time. Mostly just the tractor. The first day was a write off as he got to speed on the machine. Beyond that, he's only done a total of 4 days, one of which I was in, and one of which I was cutting. Cutting costs are about £8-9/t. I have very good cutters that I pay very well. Sawlog is going out for the most part at £69/t roadside, chip £42 and naturally, the deal that I have with the landowner is confidential. Little hiccup today as one of the tyres popped off the forwarding trailer whilst turning. That'll be about £50 to pop it back on, but that's the only unexpected cost so far. We'll be done and extracted by Wednesday next week, and it'll have been 800t in 2.5 weeks. Another 80 tonne away today.
  24. It isn't. Tractor driver on £12/hr (the rate he suggested) so he's only costing me roughly£1.80 per tonne, plus my time
  25. Sorry Matty, didn't see your post earlier. So it's a 9t trailer, but I think with 3.7s, it's not going much past 6t. When the logs are all stacked rideside by the forwarder (which I'm operating), the tractor can complete a run (average 500m to extraction point) in 30-40m. That means, including stoppages for fueling and breaks, you're on about 10t/hr. We tend to work 10hrs, and the chap on the tractor isn't quite up to speed yet so we've been doing up to 15 runs a day. Some runs have been 3m chip and 2.5m bar, so best day is around 75t so far. The forwarder is incredibly fast for putting logs to the ride side. Just doing 1/2 loads (0.75 - 1t), you're zipping back and forth, never more than 50m and not having to pay much attention to slope and I can weave between the trees. As I said, we had 100t of 3.7s leave site today, and 24t of chip. Still about 160-170t of 3.7s left, 15t of chip, 15t of 2.5s, 10t of 4.9s and 50t of 5.5s. That's after 8 days of production and that's also with the tractor driver doing his first day last Monday (up to day 4 now). So around 380t in 8 days, but as I said, training the chap on the tractor. * edit: and I only got 4 loads out today as I had to stay out the landing bay as lorries were in and I didn't have the tractor driver in today either.

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.