Got my fourth kiln load done on Tuesday and Wednesday this week. Hired in a very skilled (and very local) Woodmizer operator and a bunch of lackies for the loading!

 

A nice mix of beech, ash, epic cherry and oak, including some quite odd, but very attractive flamed oak.

 

Here are some pictures:

 

P5110035.jpg

 

P5110037.jpg

 

P5110038.jpg

 

P5110039.jpg

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 22
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Hehe! We hit one or two bits of metal work, but they were all either .22 rounds or shotgun pellets. Didn't lose any blades.

 

The woodmizer milled all the logs you can see there, plus another 3, in a day and a half. Approximately 330 cubic foot, which included a bit of oak cladding and some posts.

Edited by Steve Bullman
Link to comment
Share on other sites

Dear all,

Well, you will see that Big J spent most of the day taking photos and NOT DOING ANYTHING - AGAIN. He is currently sitting in the woods in his pimped truck with an ipad because he's too tired to cut from loading the kiln! RSI from pressing buttons all day...don't figure. :001_tt2::001_tt2:

Yours sincerely

One of J's friendly lackie's...

 

PS OK I'm sat on my couch so perhaps should say nothing! :thumbup:

Link to comment
Share on other sites

Armchairarborist, the treatment used is Wykabor:

 

Wykabor Powder / Wykabor Range / Timber Treatments / Services / Wykamol Group / Specialist products for the building and preservation industries.

 

It's a very economical way to prevent almost all mould. Costs me about £25 per kiln load plus the labour for spraying.

 

Iain - you of all people should know about delegation of work!

Link to comment
Share on other sites

Armchairarborist, the treatment used is Wykabor:

 

Wykabor Powder / Wykabor Range / Timber Treatments / Services / Wykamol Group / Specialist products for the building and preservation industries.

 

It's a very economical way to prevent almost all mould. Costs me about £25 per kiln load plus the labour for spraying.

 

Iain - you of all people should know about delegation of work!

 

thankyou, i'm off to order some now :thumbup:

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.