Technical Report required for Felling with steel cables


David Riding
 Share

Recommended Posts

I am looking to contract someone to produce a report for safe systems of work in regards to felling large trees with steel cables. I want an over engineered fail proof methodology displaying forces on steel cables and equipment choices with diagrams and calculations to stop large trees falling backwards when felling.

 

I know I can stick a 6 tonne strop 2/3 up a tree and d-shackle a 50 meter 18mm steel cable to a 20 tonne excavator and have a top notch tree feller but that aint good enough for what I need.

 

Something like a 5 cable set up with may be 4 ground anchors and one main pullling cable.

 

I will give full details with who ever takes on the report.

 

PM if you want to take on the task!

Link to comment
Share on other sites

Log in or register to remove this advert

I am looking to contract someone to produce a report for safe systems of work in regards to felling large trees with steel cables. I want an over engineered fail proof methodology displaying forces on steel cables and equipment choices with diagrams and calculations to stop large trees falling backwards when felling.

 

I know I can stick a 6 tonne strop 2/3 up a tree and d-shackle a 50 meter 18mm steel cable to a 20 tonne excavator and have a top notch tree feller but that aint good enough for what I need.

 

Something like a 5 cable set up with may be 4 ground anchors and one main pullling cable.

 

I will give full details with who ever takes on the report.

 

PM if you want to take on the task!

 

What sort of ground anchors? IMHO everything else can be predicted. Tirfir pull, weight bias of tree, "angle of attack" of cable, and the strength of all the hardware in the system etc etc. Its the anchors that are often the unknown quantity and weak point. especially if things such as vector pull isnt fully understood or accounted for. (really, really, really important)

 

The worst thing is that the ground changes so much, so ground anchors effectiveness does to.

 

My "record" was using 3 50m climbing lines and nearly 50 slings and biners to make a self equalizing system using gorse bushes (none bigger than 40mm) to winch over a leaning pine.

 

I stink at math, wish I could help!

Link to comment
Share on other sites

  • 3 months later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.