On 02/09/2019 at 20:33, Arctostaphylos uva-ursi said:

If its sandy soil with few stones 1 to 2 hours 1 - 2 hours If there are large stones/boulders then it will take much longer.  If the root system is very dense it will also take much longer.  Very difficult to answer such a question as there are so many variables. Only way to get a good idea is to dig a test pit.

Is that with a soil extractor? I just checked the soil volume from the pic that I posted above. It is 20m3... So we are looking at 20 to 40 hours per tree, assuming not extra difficulties...That is a lot.

Anyone have experience with clayey soil?

 

Cheers,

 

Island

Log in or register to remove this advert

Posted

The lighter the soil the quicker it will be, airspading takes a very long time! If you are looking to remove around 40m3 of soil you would be better off trying to source a hgv mounted soil vac. In my experience it would be 1-2 days to complete your excavations. 

  • Like 1
Posted
7 hours ago, Arboraeration said:

The lighter the soil the quicker it will be, airspading takes a very long time! If you are looking to remove around 40m3 of soil you would be better off trying to source a hgv mounted soil vac. In my experience it would be 1-2 days to complete your excavations. 

Thanks for the reply. 1-2 days with the hgv mounted vac or just with the airspade? I am, so far, thinking of using an airspade 2000, 105 cfm or 150 cfm 4ft barrel, with this:

GUARDAIR.COM

Powered by compressed air, Guardair 55 Gallon Static Conductive Drum Vacuums are ideal for vacuuming up chips...

It all depends on what I can source and the price. India has limited choice for this sort of stuff.

Posted
1 hour ago, Craig Johnson said:

yes, very slow if dry. pre soaking the night before helps

Thanks, all pits will be worked on with wet soil so I guess this will be ok.

Its almost like stone when dry. Digging bars go in about 2 cms at a time then.

Posted (edited)

So I have inquired about the soil texture:

 

Texture of most soil to be excavated:

 

Clay: 20-25%

Silt: 30%

Sand: 35-40%

Gravel: 5-10%

Does that help someone to give me an idea of time/m3?

 

Can the vacuums move the soil from one point to another instead of just into the barrel? I need to place it nearby and then move it back once I am done with the tree.

 

Thanks

Edited by Island Lescure
mixing up structure and texture...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.