Jump to content

Log in or register to remove this advert

Ash tree Dismantle


phill
 Share

Recommended Posts

Log in or register to remove this advert

You don't need much room if your good at putting stuff where you want it :biggrin::001_tt2:

 

Do you not think it depends on the job? For example I can think of a job recently large chestnut dismantle chipper on top of job, rigged/balanced big limbs lowered straight down into chipper, grounds nip the laterals and through the chipped in a oner, don't get much quicker than that! Agree though cut chuck and stack can be quick on certain jobs etc. surely that's one thing about being a good climber, not just getting a tree down quick but choosing the best method for climber and ground staff. Sometimes cut and hold is quicker

Sometimes rigging is faster depending on job and site layout

Link to comment
Share on other sites

Exactly Jay. For instance, my avatar pic was a knackered old beach over a church roof, I bangers out the front half no rigging and our mini with the grapple picked up the limbs and drove them to the chipper. Obviously had to be extra delicate over the slate church roof!

 

Every jobs different eh

Link to comment
Share on other sites

Exactly Jay. For instance, my avatar pic was a knackered old beach over a church roof, I bangers out the front half no rigging and our mini with the grapple picked up the limbs and drove them to the chipper. Obviously had to be extra delicate over the slate church roof!

 

Every jobs different eh

 

That's it everyone's different and no ones necessarily right or wrong. Just think some make hard work for themselves trying to hand hold massive bits when 2 mins to put a pulley in and 250kg is sailing to floor in one bit but then every jobs different and so is every climber, I just like to make things easy for me and the guys on the ground. Got a decent size thuja to take down tomorrow, some will be cut and chuck but from memory the low laterals over the fences and shrubs can be balanced in a oner and lowered off. I learnt from a very good climber who could cut and hold big bits but also knew when to rig, just about have different tricks up your sleeve I suppose!

Link to comment
Share on other sites

I oftenrig big branches when there's no targets,touch the tip on the ground, then the groundy(s) can pull the butt end in the direction of the chipper, apart from anything can help stop mud and gravel from going through the chipper.

Sure crash and bash works on some jobs, but the one by one method with a rope is more relaxed, less work (less tugging and wrenching of stuck branches) and more efficient.

No need for rigging pulleys a lot of times, just throw the rope over the branch above.

Every jobs different of course.

Edited by Mountain man
Link to comment
Share on other sites

I do agree that on some occasions rigging limbs off does make the job a awful lot easier especially if the tree is on a steep banking.but on this specific job we had a 12" crane fed machine & a greenmech for clearing up the smaller bits so crash & bash it was. 😃

Link to comment
Share on other sites

I see you are using a Zillon Phil....are you left handed?

 

Why would he be left handed using the zillon like that?

I'm right handed and my strop friction will always be on the left hand side or the centre!

 

 

Sent using Arbtalk Mobile App

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.