Paul Northcott
-
Posts
3 -
Joined
-
Last visited
Content Type
Profiles
Forums
Classifieds
Tip Site Directory
Blogs
Articles
News
Arborist Reviews
Arbtalk Knot Guide
Gallery
Store
Calendar
Freelancers directory
Posts posted by Paul Northcott
-
-
Did I hear a rumour that SSE had overspent their Arb budget and were dramatically cutting back on their clearance work?
-
We are urgently looking for Arb teams in many areas. Including
Rail Teams in Hampshire, Bristol, Swindon, South Wales and Shrewsbury. If you are not rail qualified this may be something we can help with.
Utility Arb Teams In Lincolnshire, Leicestershire, Northants, Warwickshire and Rutland. Again if you are an established team we can help you with your Utility Arb qualifications. There is a significant and growing amount of work for hard working teams.
In the first instance please contact me via email at [email protected]
and a Happy Christmas to everyone.
new WPD contract
in Utility Arboriculture
Posted
There seems to be a rumour going round that Ground Control are looking to halve the rates that teams are going to be paid on Span rates. I can absolutely assure anyone reading this that it is not the case. From the teams I have spoken to we are paying the same or more than the existing rates for the areas we are taking over. If anyone does want to discuss it, you can call me on 01277 844023