titan
-
Posts
3 -
Joined
-
Last visited
Content Type
Profiles
Forums
Classifieds
Tip Site Directory
Blogs
Articles
News
Arborist Reviews
Arbtalk Knot Guide
Gallery
Store
Calendar
Freelancers directory
Posts posted by titan
-
-
I only want some sort of idea! I'm sure it will open a whole new can of worms and with my first post!
-
Evening all! Just wanted to pick everyone brains, I've just been offered a job clearing HV/LV power line in Kent. I've only every worked on domestic and been employed. Its a massive change to what I'm used to and I've got to go self employed as well. I would like to know:-
1) How much a team of 3 can cut in a day?
2) What is the going rate per metre?
3) Is there plenty of work?
Many thanks
Power line job
in General chat
Posted
Sorry for being so vague! Cutting wise its a mix; some is through residential hedges/trees, other areas are through woodland. I would be given a list of pole numbers to follow and it goes from there. You're then paid for the metres cut between poles. I was told an average team cuts 100m per day and a good team will cut 150m per day.