-
Posts
48 -
Joined
-
Last visited
Content Type
Profiles
Forums
Classifieds
Tip Site Directory
Blogs
Articles
News
Arborist Reviews
Arbtalk Knot Guide
Gallery
Store
Calendar
Freelancers directory
Posts posted by top subby
-
-
im scottish power authorized day 1 you watch a presentation then you do milty test if you pass then you have an interview
-
called out for scotish power 4pm sunday got home 3am out at 7am. climbing in the dark is funny!
-
i passed 38 and 39 on same day waiting around recked my head
-
ok whats the day rate would y pay digs . what you have asked for sounds like what i do in my area
-
beef cury tonight , made from left overs
-
hang onto your old saws have you seen the price of spaire parts
-
is it me or do you find that the carnage happens every 4/5 years must clear it for a bit
-
ms460 20 and 24 plus i have an 066 witch normaly has the 24 plus a 36. use the right horse for the corse and all your saws will last
-
when you buy get the best y can and look after it
-
hiabs are the way to go
-
get some commersal experience
-
got my felling ticket in 92 before my driven test
-
Any clue as to who is United Utilities approved in the Manchester area? A friend is looking for an authorised subby in that area.
United Utilities have direct tree cutters what was left of tilhills men. But so under staffed they use poletechs . i have number try and find it as poltechs use subbys
-
the birch is a mager flat top
-
when using roll up tripod signs on windy days hang cordwood on string from the centre . hope this makes sence i have been to the pub
-
give em hell mate
-
I never use a guide on chain or bar and always get comments on how well my saws cut. I clean my bars with an angle grinder with an abbrasive pad on. Even my 341 on 3/8 chain steve!
-
we do maps whitch have hrs put on each site, say it works out at 3wk work onpaper and y do it in 2wk y get payed for 3wk . shut down/day rate is £300 per two man team but a 3rd makes it £450 a day ok if have a groundy on £80 a day
-
mate are y V C too many war films
-
-
useing new marlow 4m with vt and pully has swivel biner builtin i add on a 2m line to lengthen it
-
i do alot of line work its my bread and butter work gives me as much as i need . So i have a safty net to put good prices on other work plus when on peoples land they say can y have a look at this
-
-
ill have a go
HULL, any climbers around here??
in Employment
Posted
got in laws in brid could travel from there whats the rate 10 years climbing .