Jump to content

Log in or register to remove this advert

Charging Stihl batteries from a vehicle


Doug Tait
 Share

Recommended Posts

Log in or register to remove this advert

There is the option of the AL300-4 which can be fitted to the van. Not sure on the connections for it as I haven't seen one as yet. It charges 4 batteries at the same time. It also plugs into the mains.

  • Like 1
Link to comment
Share on other sites

26 minutes ago, gand said:

There is the option of the AL300-4 which can be fitted to the van. Not sure on the connections for it as I haven't seen one as yet. It charges 4 batteries at the same time. It also plugs into the mains.

I'll have a look at those, thanks. 

Link to comment
Share on other sites

We used to have an inverter in the truck with a mains charger. Was great on whilst traveling but would flatten the battery if you charged any more than 1 ap300 battery without the truck running. (Eggs split charge and second battery would solve this)

  • Like 2
Link to comment
Share on other sites

9 minutes ago, Will C said:

We used to have an inverter in the truck with a mains charger. Was great on whilst traveling but would flatten the battery if you charged any more than 1 ap300 battery without the truck running. (Eggs split charge and second battery would solve this)

 

AP 300 is 227wh capacity

Your average second battery would be 1320wh.

However you should only use 50% of that so 660wh.

Even at 100% efficiency thats only 2.9 charges. 

Realistically 2 charges till you need to start the engine to recharge that battery & that charge will take much longer as lead acid bats dont charge as fast.

  • Like 2
Link to comment
Share on other sites

14 minutes ago, Peasgood said:

Big solar panel on the roof, small leisure battery if you are short of space and a charge controller plus small inverter.

I have the above on my shed and run a surprising amount off it including a battery charger.

Yep, this time of year I can power everything in my box off solar. For an extra £70 ish throw a split charge relay into a van that is traveling an hour plus each way to site.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.