RAMS for crane removal


Treetom15
 Share

Recommended Posts

As the title suggests, I’m looking for advice as to exactly what I need to have in place for an upcoming job. I’ve done crane work before but always for a company as an employee or a subby. Basically I want to make sure I am all properly above board as the job is in a built up area. I am properly insured (Tree Surgeon Insurance Services) but I want to make sure paperwork is all up to scratch. I’m aware I will need a generic RA for tree works, a site specific RA on the day and a method statement for works. I’m basically after advice from people who’ve done this before, and anyone who can point me towards some templates (I’ve found the method statement one on the AA website?

Any help would be much appreciated!

Tom 

Link to comment
Share on other sites

Log in or register to remove this advert

1 hour ago, Treetom15 said:

I’m employing the driver and machine for 1 day, so a contract lift I think? As I said, I haven’t organised something like this before, it’s usually a case of just show up and do as you’re told haha!

That’s not a contract lift, that’s crane hire by the sounds of it. If things go wrong it will be on your head/insurance. You need to book a contract lift - this leaves the lift-plan and insurance to the crane firm. They then plan the whole job - size of crane required, crane positioning, worksite layout, ground pressure/pad size, weight of pieces to be removed (maximum), signaller etc etc. 

It is very important from an insurance point of view to get this clarified before you start though...

  • Like 1
Link to comment
Share on other sites

17 hours ago, monkeybusiness said:

That’s not a contract lift, that’s crane hire by the sounds of it. If things go wrong it will be on your head/insurance. You need to book a contract lift - this leaves the lift-plan and insurance to the crane firm. They then plan the whole job - size of crane required, crane positioning, worksite layout, ground pressure/pad size, weight of pieces to be removed (maximum), signaller etc etc. 

It is very important from an insurance point of view to get this clarified before you start though...

I will speak to the operator tomorrow and clarify this, as you said if it is a hire and something was to happen I would rather have the backup of the company the crane and operator came from!

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.