Background to the HSE decision on two rope working


kevinjohnsonmbe
 Share

Recommended Posts

Log in or register to remove this advert

20 minutes ago, AA Teccie (Paul) said:

Perhaps not in relation to the potential for anchor point failure but accidental detachment from one system, or cutting through of one system etc. 

Don't you already have that through the use of a side strop?

 

I would enjoy seeing the architects of the New rule,productively reduce a large Beech Tree using two climbing ropes and a side strop.

  • Like 4
Link to comment
Share on other sites

5 minutes ago, Mike Hill said:

Don't you already have that through the use of a side strop?

 

I would enjoy seeing the architects of the New rule,productively reduce a large Beech Tree using two climbing ropes and a side strop.

Maybe...'IF' the side strop is used.

 

Their intention is to introduce a failsafe into the system by default and still use the secondary anchor when working / cutting.

Link to comment
Share on other sites

I have heard that this two rope system has already been introduced within utility work. I see this as the real driving force behind the HSE's push to roll it out. 

As some overzelous health and safety officials have already deemed it necessary and have introduced the standard and relevant training as an example, why would the HSE believe that it is not viable in any other part of the industry? Whoever rolled it out within utility Arb is the real source of this problem - it was probably introduced to counter a poor skill base and lack of experience within the workforce.

 

On a secondary point, I looked at the climbers the demonstrated the systems to the HSE and they were from the top 1% of the industry and could make moving around a tree with any system effortless- the HSE needs to watch a climber of a couple of years, in basic kit stumbling his way around a street tree with two ropes. He would be sweating, swearing and constantly nervous that one of his crew is going to put the tail end of either of his climbing lines through the chipper.  Reality is often very different to what people expect.

 

  • Like 17
Link to comment
Share on other sites

20 minutes ago, Pete Mctree said:

He would be sweating, swearing and constantly nervous that one of his crew is going to put the tail end of either of his climbing lines through the chipper.  Reality is often very different to what people expect.

 

Hi Pete,

If any climbing line came close to the chipper I'd be questioning the ground crew very robustly.

"Reality" will change...in time, as will expectations.

Sorry sounds very philosophical but things do change over time...I remember being trained to free-climb up the tree and then to tie in :/ 

 

 

  • Like 2
Link to comment
Share on other sites

There is always change, but it is often not for the best & can create a real rift. I climb with two lines if required to acces the whole canopy, so I am not against it in any way where needed, but to introduce it as climbing dogma would be a mistake in my opinion.

 

What I tried to say (my written words often fail me), was that at a certain point there is so much going in the tree for the climber (especially the less experienced)that it becomes a massive negative. This overload leads to increased stress levels, fatigue and ultimately poor decision making, which is when things start to go wrong.

so, If there is a problem with peoples climbing then we need to look at initial and subsequent training and development throughout there early career - not throw another £300 worth of kit at them. There are so many instances I can personally recall where a climber makes a bad decision- even unclipping there main line due to pressure that they could not deal with leading to them making these poor decisions- I strongly believe that training & development is our route to increasing safety not this encumbering bandaid of another rope system.

 

Hope that make better sense Paul & sorry for the rant, but I have been working with poorly trained climbers making treework look dangerous.

 

  • Like 7
Link to comment
Share on other sites

Im with Pete on this one, rather than simply throw more kit at the job and have ropes all over the place making the job even harder better training and education is whats needed. what if 2 points fail do we add 3 and so on? utter crap, its more like another knee jerk reaction from people who make more money doing SFA sat in ivory towers because they know best. Whats the AA doing about it Paul? I know you have demonstrated what we do but are you actively telling them this is crap or just accepting it because it the HSE?

  • Like 3
Link to comment
Share on other sites

31 minutes ago, Pete Mctree said:

There is always change, but it is often not for the best & can create a real rift. I climb with two lines if required to acces the whole canopy, so I am not against it in any way where needed, but to introduce it as climbing dogma would be a mistake in my opinion.

 

What I tried to say (my written words often fail me), was that at a certain point there is so much going in the tree for the climber (especially the less experienced)that it becomes a massive negative. This overload leads to increased stress levels, fatigue and ultimately poor decision making, which is when things start to go wrong.

so, If there is a problem with peoples climbing then we need to look at initial and subsequent training and development throughout there early career - not throw another £300 worth of kit at them. There are so many instances I can personally recall where a climber makes a bad decision- even unclipping there main line due to pressure that they could not deal with leading to them making these poor decisions- I strongly believe that training & development is our route to increasing safety not this encumbering bandaid of another rope system.

 

Hope that make better sense Paul & sorry for the rant, but I have been working with poorly trained climbers making treework look dangerous.

 

Hi Pete, no need to apologise I quite, quite understand and I too initially ranted...but.

 

Training and development is/are key and this is where all this will begin...with 'new' T&D, involving 2 ropes systems, and hence will take considerable time to implement. The other key aspect to training is mentoring 'on the job' and this too will be required.

 

PS your written words are fine, no problem.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.