Jump to content

Real World Processor Output

Recommended Posts

19 minutes ago, Bustergasket said:

Ok i can see that at 400 plus the logs would be getting on the large side, bet u make a big pile very quickly though

That's where the 4 minute cubic metres start to come into play. Need a massive stove though, and even then, the logs are a bit heavy to handle (just physically hard to put lengthways into the stove, even when dry).

Share this post

Link to post
Share on other sites

I did 17 cube in 4 hours on my 1x42 today. Just me, 9 inch logs into boxes, l average timber and floor swept.

That's stopping every two sticks too throw the frisby for the dog as well.




  • Like 1

Share this post

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Featured Adverts


Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us