Jump to content

Log in or register to remove this advert

Excavator Based Skyline Contacts?


LGP Eddie
 Share

Recommended Posts

I'm looking for someone with a top notch Excavator based Skyline setup for an unusual project I'm pricing.

 

Ideally 20 tonne plus base unit, as the main factor is the fully suspended load it can handle safely.

This will be a very strict job in terms of safety etc and the need to keep downtime to minimum, hence wanting someone running a really nice tidy unit.

 

The project will hopefully be mid summer, which will hopefully be a quieter time of interest for someone to bring one out of the woods for.

 

The project is in North Staffordshire, but obviously such a unit is going to be from further afield, and should be around two weeks duration.

 

Any recommendations/contacts much appreciated.

 

 

Eddie.

Link to comment
Share on other sites

Log in or register to remove this advert

Ahh, shame you are so far away, I was working alongside a brilliant outfit the other day, remote controlled winch mounted up on the top of the boom of a 13 ton Doosan. pulling trees up an over a steep bank, never seen a setup like it but really was the tool for for this particular job. perhaps a bit small for what your after though...

Link to comment
Share on other sites

Ahh, shame you are so far away, I was working alongside a brilliant outfit the other day, remote controlled winch mounted up on the top of the boom of a 13 ton Doosan. pulling trees up an over a steep bank, never seen a setup like it but really was the tool for for this particular job. perhaps a bit small for what your after though...

 

Was that Will Kingwell?

Link to comment
Share on other sites

I'm looking for someone with a top notch Excavator based Skyline setup for an unusual project I'm pricing.

 

Ideally 20 tonne plus base unit, as the main factor is the fully suspended load it can handle safely.

This will be a very strict job in terms of safety etc and the need to keep downtime to minimum, hence wanting someone running a really nice tidy unit.

 

The project will hopefully be mid summer, which will hopefully be a quieter time of interest for someone to bring one out of the woods for.

 

The project is in North Staffordshire, but obviously such a unit is going to be from further afield, and should be around two weeks duration.

 

Any recommendations/contacts much appreciated.

 

 

Eddie.

 

Hi EDDIE JOY OFF HERE HAS ONE mate thanks Jon

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.